Will Thameslink through Farringdon be back to normal for Monday rush hour?
A possible structural problem at the Farringdon tunnel shut every line between St Pancras and Blackfriars on Sunday morning, with Thameslink saying disruption would last until mid-afternoon. Engineers have to sign off the tunnel before trains can run again. Will commuters be fine on Monday?